Verney Road

Take a look at some of our work

Verny Road was a project SKJ site team was brought in to install a new building for N power network. This project started with the team setting the stud work out to the right heights and distances to the correct design grid lines. This is really important to get right, as can throw the whole building out. Once the studding was set out the crane could come and start installing all the columns, the crane was set with slew restriction to minimise any danger of us getting close to the building, all columns and internal steel went in very smoothly without any problems. Once the building was tied in, the bracing could then be added. Their site engineer then came out to check our heights and was happy with every column, so could move on with the installation. All internal steel to take the slab flooring was then installed, followed by the cable trays at the top of the building. The site team had a tricky installation as they had to allow space for the slabs to be floated in, good planing and a good sequence allowed this install to go smoothly. Once all the tabs were installed the finishing of the building could be installed i.e. Perlins, sheeting rails and 4 staircases with handrails and grating flooring. In all this was a very impressive install and the SKJ site team worked very safely and efficiently with a number of MEWPS as it was a very small area. 

Our team of experienced professionals is fully qualified and equipped to handle any project, big or small. We pride ourselves on our craftsmanship and attention to detail. Whether it’s installing a footbridge or crafting bespoke steel handrails, we ensure a seamless and efficient service every time.